COMANCO Wraps Up California Landfill

COMANCO Environmental recently completed a landfill lining project in Imperial, CA. COMANCO installed over 275,000 square feet of 60 Mil HDPE Double Sided Textured Geomembrane, 254,000 square feet of 200 Mil 6 OZ Double Sided Geocomposite, and 43,000 square feet …

Read more
by

COMANCO Begins Work in Southeast Idaho

COMANCO Environmental has begun prepping for the deployment of HDPE liner for a phosphate plant in Southeast Idaho. The 61 acre stack features 390,000 square feet of single-sided textured 60-mil HDPE geomembrane and 2.25 million square feet of double-sided textured 60-mil …

Read more
by

COMANCO Attends Hydraulic Excavator Training

On March 24th and 25th, Hydraulic Excavator Training was held at Ring Power in Riverview for ten COMANCO operators.  The training objectives for the Caterpillar Equipment are for safety, operation and product information.  The factory approved instructors at Ring Power …

Read more
by

COMANCO Completes Landfill Pipe Repair

COMANCO recently made a repair to an 18″ diameter HDPE Header Gas Collection Pipe at a landfill in Florida.  After receiving the initial call, the entire COMANCO team worked diligently to respond to the client and help get this repaired quickly and …

Read more
by