COMANCO started a Cooling Pond Liner Installation project at a closed chemical plant in Florida this past week. The project scope is comprised of the installation of 160 acres of smooth and textured HDPE liner with the installation of geocomposite as a gas ventilation system underneath the liner. The crew is being led by Project Superintendent Max Macedo, Project Engineer Craig Stevenson (on-site), Project Manager Dragan Milosavljevic, and Project Engineer Nick Bridges. The project is expected to be completed by the summer of this year.