• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

COMANCO Completes Outfall Structures

by

COMANCO completed the final phase of its storm-water project in Central Florida recently.  The final phase, which consisted of installing 4 new precast inlet structures and 36” outfall pipes set in a new fabriform aeration basin, was completed earlier this month.  The project was a true team effort, utilizing everyone’s skill and experience to complete a project that endured numerous modifications along the way.  The job was a great success, as you can see by the before and after photos,  and most importantly, completed with zero safety incidents.  The project was led by Superintendent Gary Mitchell and Project Engineer Dan McRae.

Downstream - AFTER Downstream - BEFORE New Walkway Upstream - AFTER Upstream - BEFORE