• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

Waste Water Pond Repair City Of Melba Complete

by

COMANCO complete an emergency repair for the City of Melba on a Waste Water Treatment Pond. An aerator had contacted the slope which punctured the liner and caused subgrade erosion . A 10’ x 10’ patch was placed over the damaged area after the subgrade was repaired. We also repaired damage on several other pond while onsite. Project was high risk due to working within feet of wastewater while on the slope. Project was completed with no incidents. Project was lead by Foreman Pablo Medina.

Melba_wwtp_pond_repair_2-14-130melba_wwtp_pond_repair_2-14-131melba_wwtp_pond_repair_2-14-132melba_wwtp_pond_repair_2-14-133melba_wwtp_pond_repair_2-14-134melba_wwtp_pond_repair_2-14-135melba_wwtp_pond_repair_2-14-136melba_wwtp_pond_repair_2-14-137melba_wwtp_pond_repair_2-14-138melba_wwtp_pond_repair_2-14-139melba_wwtp_pond_repair_2-14-1310melba_wwtp_pond_repair_2-14-1311melba_wwtp_pond_repair_2-14-13