The COMANCO crew in Louisiana has been working for the past 3 ½ months on the PCS Nitrogen Area 11 Cap in Geismar, and they have about 1 month to go. Recently, the crew finished 20 acres of the 40 acre lining project, which consists of the installation of 60 mil textured HDPE geomembrane and double-sided geocomposite. The crew has also been working on the installation of several smaller items such as HDPE seepshields, drainage pipe, and geotextile. The crew is led by Luis Espinal (Site Superintendent), Scotty Martone (Estimator/Project Manager), and Nick Bridges (Project Engineer).