Project Superintendent Max Macedo and crew have been moving steadily with the liner installation on a cooling pond project at a chemical plant in Florida. The job started in February, and the crew has lined 110 acres of the 155 acre area and should finish up by mid-July. The liner system consists of 40 mil textured and smooth HDPE and a geocomposite gas venting system.