COMANCO Completes Five Layers in Montana

Over the course of three months, the COMANCO crew, led by Foreman Alejandro Loza, completed the installation of a five-layer system for an energy production client. The team installed nearly 800 thousand square feet of each layer. The system is …

Read more
by

COMANCO Utilizes Drone Technology

A prominent reason for COMANCO’s success in SAFETY, QUALITY, and SERVICE is our drone capabilities.  Drone pilot and QC Engineer, Evan Bao, has the ability to fly our drone while taking photographs AND video. COMANCO utilizes a drone, specifically for …

Read more
by

COMANCO Attends Viewpoint Conference 2018

This week, Vice President Christine Thomas and Controller Stephen Curcio traveled to Portland, Oregon to attend the Viewpoint Conference 2018.  This annual event is being held at the Oregon Convention Center in beautiful Downtown Portland. The event kicked off last …

Read more
by

COMANCO Completes a New Mine Site

The COMANCO crew led by Martin Calderon recently finished the very first containment system for a mining customer in Central Nevada. Throughout the two-month project, COMANCO installed over a million square feet of 80mil textured liner, 60mil smooth liner, drain …

Read more
by