Another Project in Alaska is Completed

The Carbon in Column Pipeline liner installation project in Fairbanks, Alaska has just finished. The COMANCO team concluded the termination of the pipeline corridor with two 36-inch pipe boots and bentonite plugs. Superintendent Martin Calderon oversaw the completion of this …

Read more
by

COMANCO Recieves AIC Plaque From IAGI

On Thursday, July 11th, COMANCO received its 2013 plaque from the International Association of Geosynthetic Installers (IAGI) for becoming an Approved Installation Contractor (AIC). COMANCO’s AIC status says much about our dedication to the Geomembrane installation industry and better quality …

Read more
by

Training Is Now In Session

COMANCO Employees attended classes early in  July for Task Training. MSHA (Mine Safety and Health Administration) requires employees to be Task Trained on all tasks being performed while on a Mine site. The training for each new task includes safe work …

Read more
by

Forward Landfill Progress

The Forward Landfill crew has completed a good portion of the lower and upper slope work on the project in the past week. The geosynthetic clay liner (GCL) and 60-mil single sided textured high density polyethylene (HDPE) liner has been …

Read more
by

Forward Landfill Has Just Begun

The Forward Landfill liner job located in Manteca, California has just started this week. This project has multiple benches and differing slope grades for the COMANCO team to install over. There is geosynthetic clay liner (GCL), 60-mil single-sided textured high …

Read more
by

Fort Knox Project Update

The liner project for a heap leach pad in Fairbanks, Alaska has progressed a great deal in the past couple of weeks. The low-density polyethylene (LLDPE) 80-mil liner and geosynthetic clay liner (GCL) are starting to cover a large portion of the …

Read more
by

Coffin Butte Oregon Landfill Construction

Liner installation has begun at the Coffin Butte Landfill in Oregon. The installation includes a nine-layer installation on the slopes. These layers consist of: geotextile separator, tertiary 60-mil double-sided textured high density polyethylene (HDPE) liner, double-sided geocomposite, secondary 40-mil double-sided …

Read more
by