COMANCO Completes Excavation of Barge Area

A COMANCO crew (led by Project Superintendents Charlie Ingle and Bill Newman) recently completed a second mobilization of a Spray Evaporation Pond project in Central Florida. This mobilization included repairing a few washouts of access roads due to rain events …

Read more
Uncategorized
by

COMANCO Project in Grass Valley, California

COMANCO has recently finished the first pond in a Waste Water Treatment Facility in Grass Valley, California. Superintendent Martin Calderon and his crew installed over 65,000 square feet of 60-mil Smooth High Density Polyethylene (HDPE) geomembrane. They also installed a …

Read more
Uncategorized
by

COMANCO Installs Geomembrane Floating Cover in Midwest

COMANCO Environmental recently wrapped up a leachate collection pond floating cover project just South of St. Louis, MO. A 60-mil HDPE geomembrane was installed on the pond’s floor and up the slopes. A 40-mil LLDPE geomembrane was then extrusion welded …

Read more
Uncategorized
by

COMANCO Completes Sand Tailings Drain Project

COMANCO recently completed a drain system installation project for a sand tailings pit on a mine in Central Florida. The crew installed 4,000 LF of 36″ HDPE pipe and 20,000 LF of 12″ HDPE pipe wrapped in geocomposite for storm …

Read more
Uncategorized
by

COMANCO Completes Liner Installation in Louisiana

COMANCO completed the installation of 40 mil HDPE liner last week on a pond closure project in Louisiana. The project totaled approximately 1,600,000 SF of 40 mil liner installed with 40,000 SF of 60 mil HDPE liner installed on three …

Read more
Uncategorized
by

Project Near El Paso Texas Is Almost Complete

The COMANCO evaporation ponds project near El Paso, Texas is nearing completion. Superintendent Martin Calderon and his crew have nearly all 8 ponds completed. The project includes installation of over 1,600,000 SF each of 40-mil high density polyethylene (HDPE) conductive …

Read more
Uncategorized
by

COMANCO Project in Northwestern Utah

Work is complete on a COMANCO project in northwestern Utah. The project consisted of deploying 2′ geocomposite vent strips and 2 layers of 60-mil DS textured high-density polyethylene (HDPE) geomembrane for a new landfill liquid waste pond. The project included …

Read more
Uncategorized
by

Coal Ash Landfill – Central Florida

COMANCO is currently working on the installation of a multi-layer geosynthetics system in a coal ash runoff pond in Central Florida. The project includes two cells of approx. 4.5 acres each. Each cell is made up of a four layer …

Read more
Uncategorized
by

Liner Install in South Florida

COMANCO completed the installation of a 60 mil HDPE Textured Liner near Pembroke Pines, Florida last week. The project consisted of removing an existing liner, and installing a new geomembrane liner at a WWTP. The crew, led by Superintendent Tommy …

Read more
Uncategorized
by

Dunes WWTP Re-Lining Project

COMANCO recently completed lining two WWTP holding ponds at the Dunes WWTP in Palm Coast, Florida. The project consisted of removing the existing liner, re-grading, and lining with a new 60 mil HDPE Textured geomembrane material. COMANCO worked for Besch …