Pump Station Improvements at Landfill

Uncategorized
by

COMANCO recently started an improvement project to a pump station at a landfill near Riverview, Florida. The project is a three step process to expand the current configuration of the forcemain pipe and fittings, to extend the cleanouts beyond the concrete wall, and to assemble and mount the flares back in operation. The COMANCO team will be working similarly on two different cells at the landfill. Safety officer Francisco Vargas and project superintendent Charlie Ingle have done a great job at the start in utilizing the gas monitor and blower onsite to ensure the safety of the crew at all times. Please enjoy some photos from the first two days of work!

About

Leave a Reply

×

Newsletter Signup

Your Name (required)

Your Email (required)

Input this code: captcha