Fabriform Installation Completed

by

COMANCO recently completed the installation of 4,000sf of Filter-Point Fabriform on a project near central Florida. The fabriform was installed in conjunction with a larger contract in performing regular maintenance on the HDPE geomembrane. The crew performed the installation on schedule and with zero incidents or quality concerns. Great job to the whole crew, led by foremen Gerardo Ruiz and Kenny Frazier!

IMG_1236 IMG_1233 IMG_1352 IMG_1391 IMG_1396 IMG_1589 IMG_1586