COMANCO Completes Liner Project at Seacoast Utility Authority

by

COMANCO has completed the last phase of its work at the Seacoast Utility Authority in Palm Beach Gardens, FL. COMANCO installed the original pond at the waste water treatment plant, and was called upon by RJ Sullivan to complete the liner work associated with the installation of a new pump station. COMANCO first mobilized onsite to cut the liner back to allow RJ Sullivan to install the new pipe line. We then re-mobilized this week to replace the liner and install cap strips where needed to allow the pond to be operational once more. The project was a great team effort between Superintendents Bill Newman, Juan Gomez and Tommy Herrmann and their crews to get the job done well and safely!