COMANCO Environmental has wrapped up a 6-acre acre Ash Monofill Closure project in Ft. Lauderdale, FL.  COMANCO used the site’s existing ash and balanced it to a design subgrade without having to import any additional materials.  The subgrade was then proof-rolled before a textured 40-mil HDPE geomembrane cap was deployed.  Thousands of feet of webbing,  sandbags and posts were then installed to provide ballast to the temporary HDPE cover.  A 450’ long x 30’ wide road extension was installed as the final part of project to maintain access for the facility.  Two feet of road base – placed in 1’ compacted lifts – was placed with a 1.5” asphalt layer capping it off.  

20150527_090259

Superintendents, Chase Yarbrough & Larry Graham, did a great job maintaining  a safety-first mindset while keeping a productive project with varying crew sizes that reached up to 20 employees during certain operations. 

20150527_094439

20150527_093746

20150527_091210

DSC01808 DSC01807 20150527_115056

?

?

20150522_100547 20150522_100205 20150519_140021 20150519_092138 20150519_092134 20150519_092119