COMANCO has started work at a Southern California Landfill

by

COMANCO has started work on a landfill located in Southern California. The project size is approximately 500,000 SF of geomembrane construction and consists of installing 40 mil Double-Sided Textured liner, 60 mil SuperGrip Net and GCL on the bottom of cell floor. The Slope consists of 40 mil Double-Sided Textured Liner, 60 mil Single-Sided Liner, and GCL. The actual installation of the GCL will be quite complicated as they are all GCL custom roll lengths. The Field Superintendent is Jorge Barrantes. The Project Manager is Scott Harker with Project Engineers Ruben Rios Llamas and Christopher Washa. We look forward to completing this project on time, safely and under budget.