COMANCO Completes Ditch Liner

Today a COMANCO crew was finishing the installation of an HDPE liner into a siphon ditch on a chemical plant gyp stack in Florida. The crew, led by Project Supervisor Max Macedo, was also visited by Vice President Tommy Topp, …

Read more
by

Chemical Plant Gyp Stack Closure

A COMANCO crew is rounding the corner of a gyp stack closure project at a chemical plant in Florida. The 24″ header installation is about halfway complete (5,600 LF installed), and the 12″ corrugated lower drain system is nearing 3,000 …

Read more
by