Landfill Cell Expansion in Bartow, Florida

COMANCO recently started the geosynthetics installation at the Cedar Trail Landfill for the Cell 7 Expansion Construction project. The liner system consists of 6 layers of Geosynthetic Clay Liner, HDPE Geomembrane, and Double Sided Geocomposite. T…

Read more
Uncategorized
by

COMANCO Completes Pond Ballast Tube Installation

COMANCO completed the installation of ballast tubes in an evaporation pond located in Patrick, NV. Crew removed old sandbags from the pond bottom and installed approx 57 each 6 foot long by 8 inch diameter sand filled tubes to help ballast the pon…

Read more
Uncategorized
by

Waste Water Pond Repair City Of Melba Complete

COMANCO complete an emergency repair for the City of Melba on a Waste Water Treatment Pond. An aerator had contacted the slope which punctured the liner and caused subgrade erosion . A 10’ x 10’ patch was placed over the damaged area after the sub…

Read more
Uncategorized
by

Liner Repairs in Escambia County, Florida

COMANCO recently performed HDPE liner repairs at the Perdido Landfill in Escambia County, Florida. After receiving a call on a Tuesday from the client, COMANCO put forth it’s best effort to meet the client’s needs and successfully provided a quote…

Read more
Uncategorized
by

PCS Nitrogen Area 11 Cap – Stage I Complete

The COMANCO crew in Louisiana has been working for the past 3 months on the PCS Nitrogen Area 11 Cap in Geismar, and they have about 1 month to go. Recently, the crew finished 20 acres of the 40 acre lining project, which consists of the install…

Read more
Uncategorized
by

Freeport McMoRan Safety Letter of Commendation

COMANCO received a letter of commendation for Safety with Freeport McMoRan Copper & Gold Bagdad Operations. Special thanks go to Superintendent Amparo Hernandez Vences, Foreman Carlos Garcia, Foreman Pablo Medina & their crews, who worked on the B…